<div id="lhzhd"></div>

    <big id="lhzhd"></big>

    <dl id="lhzhd"></dl>
    <em id="lhzhd"></em>

    <delect id="lhzhd"><address id="lhzhd"><rt id="lhzhd"></rt></address></delect>
    <dl id="lhzhd"></dl>
    <em id="lhzhd"></em>
    <em id="lhzhd"></em>

     
    中文 Consultation Add to Favorites  
     
     
     
    The Trail Pressing of WD's 2200T Dishing Press succeeded.       21,2011
    WD Obtained "Private Enterprise of Technology , Jiangsu Province".       21,2011
    Warmly Celebrate WD's Consummation of The Opening Ceremony       21,2011
    WD HEADS CUP, Top Line & Second Line Press Contest       23,2011
    WD's Opening Ceremony On March 23rd,2011       26,2011
    WD's Newly-built 4m Spinning Machine Has Been Put Into Use.       26,2011
    WD Put Across The Authentications of ISO14001&GB/T28001      Dec 22,2010
    WD Participated in The 12th China Gases Forum      Nov 14,2010
    The Monthly-Production of WD Heads Broke Through 1000-Tons.      Nov 2,2010
    WD Participated in The 4th China (Shanghai) International Exhibition of Pressure Vessel and Pressure Conduit Technique and Equipment       Oct 20,2010
    The Cutting Division of WD        20,2010
    Obtained The Qualificatioan Authentications of PED, The Welding Technics Assessing, NDE And Lloyd’s Register of Shipping (Aisa)        17,2010
    Congratulations to WD of Getting the ISO9001:2008 Quality System Certificate On Aug. 5,2010       13,2010
    Zhangjiagang And Changzhou City Court Special Prosecutor Leaded His Party to Survey WD.       29,2010
    Certificate of Authorization From the National Board of Boiler & Pressure Vessel Inspectors was obtained on June 21.       17,2010
    On June 21st, 2010, Obtained NB U.S. Pressure Vessel Registration       17,2010
    Warmly Celebrated The WD's 3000T Double-Acting Hydraulic Press's Pressure Test succeeded.       11,2010
    A Successful Trial Press Was Operated by Fully Automatic Numerically-Controlled Hydraulic Press of 3000T.       11,2010
    Obtained The ISO 9001:2008 Quality System Certification       5,2010
    ISO 9001 Quality System Certification ended.       5,2010
    On June 2nd, 2010 Obtained ASME U Stamp Certificate Certificated by ASME Headquarters in The United States .       22,2010
    ASME Certificate Was Obtained on June 2nd.       22,2010
    WD's Expo Touring       14,2010
    China Forging Association leadership Came to Weinuode for Guidance.       12,2010
    Some Leaders From Confederation of Chinese Metalforming Industry Visited WD.       12,2010
    The First Successful Pressure Test of 680 Tons Press       2,2010
    A Successful Trial Press was Operated by Fully Automatic Numerically-Controlled Hydraulic Press of 680T.        2,2010
    WD's Success of The First Solution of The Heat Treatment Furnace       28,2010
    Having Success on The First Solution Heat Treatment.       28,2010
    Fully Automatic Numerically-Controlled Hydraulic Press of 3000T was Installed.       22,2010
    共 50 條信息 第1/2頁 首頁 | 上一頁 | 下一頁 | 末頁
     
     
    News
    Industry News
    Media reports
     
     

    Contact: Ms Li Lijuan
    Tel : 0519-81232555
    Fax : 0519-86216683
    Address: Caoqiao Industrial Park, Xueyan Town, Wujin District, Changzhou, Jiangsu, China
    Website : 
    www.wwuu5.com
    E-mail : lilijuan@weidft.com

     
     

    Last Updated: 2014-10-8

     

    Visitors:

    噜噜啊 噜噜色 噜噜网